How are welded steel pipes processed?

Date:2023-10-16View:172Tags:3lpe coated pipes,carbon steel pipe china,api 5ct tubing
Usually, steel pipes are divided into two types: seamless steel pipes and welded steel pipes according to the production method. This time I will mainly introduce welded steel pipes.

Welded steel pipes are seamed steel pipes, which are formed by bending the pipe blank (steel plate and steel strip) into a pipe with the required cross-sectional shape and size through various forming methods, and then welding the welds through different welding methods . The process of obtaining steel pipes. Compared with seamless steel pipes, welded steel pipes have higher product accuracy, especially wall thickness accuracy, simple main equipment, small floor space, continuous operation during production, flexible production, and a wide range of unit products.

Welded pipes should be divided into three categories based on production technology: spiral submerged arc welded pipes; straight seam double-sided submerged arc welded pipes; resistance welded pipes.
1. The production process of spiral steel pipe is roughly as follows
The raw materials of spiral steel pipe are steel strip coil, welding wire and flux.
Before forming, the steel strip is leveled, trimmed, surface cleaned and transported, and pre-bent.
The welding seam control device is used to ensure that the welding seam meets the welding requirements and strictly controls the pipe diameter, misalignment amount and welding seam.
After being cut into individual steel pipes, each batch of three steel pipes must go through a strict first inspection system to check the mechanical properties, chemical composition, fusion status of the welds, the surface quality of the steel pipes, and ensure that the pipe manufacturing process is qualified through non-destructive inspection. Only then can it be officially put into production.
2. Straight seam submerged arc welded pipe
Longitudinal submerged arc welded pipes are generally made of steel plates. After different forming processes, the welded pipes are formed by double-sided submerged arc welding and post-weld diameter expansion.
The main equipment includes milling machines, pre-bending machines, forming machines, pre-welding machines, pipe expansion machines, etc. At the same time, there are various methods of forming LSAW pipes such as UO (UOE), RB (RBE), JCO (JCOE), etc. The steel plate is first pressed into a U shape and then into an O shape in a forming mold, and then internal and external submerged arc welding is performed. After welding, the diameter (expansion) is usually referred to as the end or full length of UOE welded pipe. It is UO welded pipe. Roll bent steel plates are then subjected to internal and external submerged arc welding. After welding, the diameter is enlarged to RBE welded pipe or not to RB welded pipe. The steel plate is formed in the order of J-type - C-type - O-type, and after welding, the diameter is expanded to a JCOE welded pipe or not to a JCO welded steel pipe.