Requirements specified for lsaw pipes

Date:2024-02-28View:49Tags:g105 drill pipe,carbon steel pipe stockist,round carbon steel pipe

Generally, welded pipes are used to transport low-pressure fluids. It is made of Q195A, Q215A and Q235A steel. It can also be made from other mild steels that are easily weldable. Steel pipes are subjected to tests such as hydraulic pressure, bending, and flattening, which have certain requirements for surface quality. The usual transportation length is 4 to 10 meters, and a certain scale (or double ruler) is often required for transportation. The specifications of welded pipes differ from the actual specifications in nominal diameter (millimeters or inches). According to the regulations on the wall thickness of welded pipes, there are two commonly used steel pipes and thickened steel pipes. Steel pipes are divided into threaded and unthreaded according to the shape of the pipe end, that is, the size of the welded steel pipe.

What should we pay attention to when using straight seam steel pipes?
There are strict technical requirements for the installation and use of straight seam steel pipes. According to the actual situation, operating procedures must also be followed to ensure safety and quality. During general use, the following points need to be noted for straight seam steel pipes:
1. Construction preparation before use of straight seam steel pipe
The pipe trenches must be dug, the tube wells must be laid, the various straight seam steel pipes required must be in place, and the various tools required, including welding machines, cutting machines, electric hammers, polishing machines, etc., must be fully prepared. . Only after a series of preparations have been completed can the installation of straight seam steel pipes begin.

2. Use quality requirements
Branch pipes should not be welded at the welds, and welding at bends should be avoided; the deviation of the vertically installed risers should be less than 3 mm per meter, and the horizontal installation deviation should be less than 1 mm; the welds must be straight and the welds must be complete , there is no burn-through or crack on the weld surface.